Form 1 | Contract between Expoconsta and Customer, with full list of the documents, which are to be allowed 45 days before the exhibition mounting for approval of the stand construction (indicated in point 2 of this contract) |
Form 1A | Confirmation report of the technical docxumentation and control of the quality of electrical works |
Form 3a | Regulations for electrical work at exhibitors stands |
Form 4 | Suspension order regulation inside the halls, if you plan it |
Form 4A | Information about suspension |
Form 4B | Prices for the suspension |
Form 4B | Prices for the suspension(start at 01.07.2022) |
From 6 | List of the documents, which are to be allowed for the approval of the construction of the two-storied stand, if you do it |
From 6A | Information about two-storied stands |
Form 6B | Safety conditions for the designing and construction of one-storey ande two-storied stands at the EXPOCENTRE Fairgrounds |
Form 8 | Guarantee letter for all stands |
Package of examples |
Forms 4-4a, 5 - are filled in, if customer need this service
Forms 6-6a additionally for two-storied stands only