Form 1 | Contract between Expoconsta and Customer, with full list of the documents, which are to be allowed 45 days before the exhibition mounting for approval of the stand construction (indicated in point 2 of this contract) |
Form 1A | Confirmation report of the technical documentation and control of the quality of electrical works |
Form 3 | Electrical scheme |
Form 4 | Suspension order regulation inside the halls, if you plan it |
Form 4A | Information about suspension |
Form 4B | Prices for the suspension |
Form 5 | Order form for rent (with installation) of electrical equipment, if you do not have your own electrical equipment, and if Expoconsta has a possibility to provide it to the moment of your order. |
From 6 | List of the documents, which are to be allowed for the approval of the construction of the two-storied stand, if you do it |
From 6A | Information about two-storied stands |
Form 6B | Safety conditions for the designing and construction of one-storey ande two-storied stands at the EXPOCENTRE Fairgrounds |
From 8 | Guarantee letter for outside stands |
Package of examples |
Forms 4-4a, 5 - are filled in, if customer need this service
Forms 6-6a-6b – are for two-storied stands only